Your workshop’s plan,still true at four o’clock.

Every job on one board. Every step timed on the floor. Every ticket checked against what it took.

Try Metral free for 14 days — no card needed.

The Metral schedule board on a Tuesday morning: seven workstations down the side, today across the top, each job a block coloured by state, with a red line marking the current time.

The schedule board, with made-up orders and people. The interactive version is built for a mouse and opens on its own page. Take the full tour →

How it works

  1. 01

    Plan

    You set the steps and the times. Your estimates, not ours.

  2. 02

    Execute

    The floor has nothing to type. Every answer is a tap.

  3. 03

    Measure

    Real hours land against what you estimated.

  4. 04

    Replan

    The plan moves around what actually happened.

Every day, the next plan is built on yesterday’s real hours.

What you find out

How long the job actually takes

  • Which step ran overBy how much, and who was on it.
  • Which jobs went out lateAnd what pushed them there.
  • Every stint loggedExportable when the accountant asks.
Harrington · kitchen islandEstimated 7h 24 · Actual 8h 18
StepEstimatedActualVariance
Saw · Marek2h 001h 55−5 min
CNC · Tom2h 152h 43+28 min
Edge Polisher · Sam2h 002h 31+31 min
Mason · Dan1h 091h 090
Whole job7h 248h 18+54 min

What you learn

Which steps always run over, and which machine is the bottleneck

Actual against estimate

Last month, by stage. The line is your estimate.

  • Saw 9 jobs103%
  • CNC 7 jobs115%
  • Edge Polisher 4 jobs122%
  • Mason 8 jobs99%

Machine load

  • CNC91%
  • Saw78%
  • Mason64%
  • Edge Polisher49%

Edge Polisher takes 22% longer than you estimated, on a machine that sits idle half the week.

Quote it properly, or move the work. Either way you knew by Friday, not at year end.

Illustrative figures from a made-up month.

Pricing

Pay for workstations, not people

£299 a month for up to 5 workstations, and £30 for each one after. No charge per user.